BOKAWATER · Specialist series03 / Seawater desalination
BOKAWATERSeawater desalination
Seawater desalination

Equipment

Develop a seawater RO enquiry around intake conditions, water demand and the realities of operating near the coast. Intake, product-water finishing and concentrate handling belong in the same project conversation.

Project design data

Complete the blank project-value column and share the file with your enquiry. This is a planning worksheet, not an equipment specification.

Parameter / interfaceUnit / formatWhy it matters
Seawater analysis / salinityLaboratory report; g/L or mg/LProvide units, sample location, date and seasonal observations.
Temperature / intake availability°C; hours and interruptionsState expected operating conditions and known access constraints.
Useful-water demand / storagem³/day; m³Separate average demand, peaks and reserve storage.
Product-water use and targetDefined quality and test pointIdentify finishing, storage and distribution responsibilities.
Concentrate / other waste streamsm³/h; proposed handling routeIdentify who confirms the route and project requirements.
Energy comparison boundarykWh/m³; included equipmentAsk for conditions and all equipment included in the figure.
Service and acceptanceAccess plan; test protocolAgree maintenance logistics, operator training and handover evidence.

Download project data sheet (CSV) ↓

Seawater RO projects: define the scope from intake to useful water ↗
Compact seawater RO equipment

Reference equipment · configuration subject to project review

Compact seawater RO equipment

This is a catalog reference, not a case study or a certified performance statement. Use it to discuss the equipment family; request current specifications for your actual water conditions.

View the original equipment reference ↗

What to prepare

  • Seawater salinity, analysis and temperature range
  • Intake arrangement and seasonal water changes
  • Daily water demand, product quality and storage
  • Power, concentrate route, corrosion exposure and service access
A nominal output is meaningful only with stated salinity, temperature and product-water conditions.

Make the scope explicit

Ask the proposal to distinguish equipment supply, civil works, external piping, electrical connections, commissioning, training and consumables. Confirm each responsibility in the project quotation. Items discussed on this website are planning considerations, not an automatic inclusion in every supply package.

Bring us the conditions. Let’s define the system.

A useful enquiry can start before every parameter is known. Tell us what you know and where engineering input is needed.

Discuss your project